Photo documentation
-
-
January 17, 2018 – There is a fresh snow cover hiding almost finished underground part of the building.
-
-
December 18, 2017 – There are only a few surface working missing before handing the underground part in the very beggining of an upcoming year.
-
-
November 30, 2017 Workers have already finished the last floor of the underground car park. They are about to hand the underground part in January 2018.
-
-
September 9, 2017 – Workers are about to finish the last floor of the underground car park. We are almost at the ground.
-
-
August 8, 2017 – There is only one floor of the underground car park missing to get from the twelve metres depth to the ground.
-
-
June 6, 2017 – Ceiling of the third floor of the underground car park is completed.
-
-
May 5, 2017 – There is a ceiling of the third floor of the underground car park on one half of concreted base board.
-
-
April 27, 2017 – We are working on preparation for concreting remaining parts of base board.
-
-
April 8, 2017 – Workmen are working on concreting the base board by using special pump.
-
-
February 27, 2017 – Some workmen are preparing the base board while others are working on insulation.
-
-
January 10, 2017 – Strong frost stoped us from working on insulation under the base board. At least we are hauling off soil from building site near Veselá street.
-
-
December 12, 2016 – We are preparing the foundation for the base board which is going to be interlock with base piles.
-
-
November 10, 2016 – There is a 45 metres derrick with a 50 metres long boom dominating the bulding site. In historical city center of Brno is derrick like that one for the first time!
-
-
October 7, 2017 – Most of the base piles were drilled withnout problems. We are already prepared for a derrick coming in a few weeks.
-
-
September 2, 2016 – Workmen are completing the boring platform which enable digging out almost fifty piles. Those will ensure perfect structural stability.
-
-
August 16, 2016 – The drilled side is strenghthen with slanting armatures. There is a ground water at buiding site but thanks to geological research we ready for it.
-
-
July 18, 2016 – Workmen finished concreting of panelling. Somewhere there is the depth of output soil 11 metres it means the depth of base board of the underground car park.
-
-
April 21, 2016 – Workmen are slowly finishing the panelling near Slavia Hotel. At the same time there are archeologists to pick up objects from deep layers of building site.
-
-
March 8, 2016 – There is a fresh snow cover on International Women´s Day. More important information is archeologists finished they research today and the building site is fully ready for workmen.
-
-
February 4, 2016 – Archeologists are about to finish their research while workmen continue in panelling.
-
-
January 4, 2016 – A fresh snow cover slowed archeologists and workmen in their afforts. But we are still in time.
-
-
November 27, 2015 – Workmen are working on drilled side to protect themselves before lanslide.
-
-
November 23, 2015 – Archeologists discovered bases of barracks from 18th century and also remainders of city houses from 13th century leading to Veselá street.
-
-
October 26, 2015 – There was a meeting of city leaders and journalists today.
-
-
September 20, 2015 – An archeological finds are after their documenting backfilled again.
-
-
August 25, 2015 – Our archeologists digged through the 14th century. They have found medieval travelling button.
-
-
August 7, 2017 – Archeologists are digging through various layers of our history.
-
-
July 25, 2015 – An archeological works and finds are about to start.
-
-
July 14, 2015 – We are launching building operations. We have to remove tarmac surface first.
-
-
July 2, 2015 – Carpark is fully cleared out!
-
-
May 21, 2015 – The building site is establishing in a part of car park.
-
-
November 6, 2014 – Place for our new Concert Hall – Carpak between Besední street and Veselá street.